How does “Consider Only First Movement” affect Generated Pipeline metrics?
The Consider Only First Movement setting determines which pipeline stage movement RevSure uses when calculating Generated Pipeline metrics.
The opportunity always remains associated with the reporting period in which it originally entered Pipeline.
What happens when “Consider Only First Movement” is set to True?
RevSure uses the first Pipeline stage movement and the opportunity value recorded at that point.
Example:
If an opportunity enters Pipeline Stage 1 at $5 in the Previous FQ and later progresses to Pipeline Stage 2 at $10, RevSure reports:
Previous FQ → Pipeline Stage 1 → $5
What happens when “Consider Only First Movement” is set to False?
RevSure keeps the opportunity associated with the period when it originally entered Pipeline, but uses the more recent applicable pipeline stage record.
Using the same example, RevSure reports:
Previous FQ → Pipeline Stage 2 → $10
The opportunity is not counted twice, so the Generated Pipeline Value would be $10, not $15.

Does the opportunity move to a new reporting period when its pipeline stage changes?
No. The Pipeline timestamp remains tied to when the opportunity originally entered Pipeline.
For example, if an opportunity entered Pipeline in the Previous FQ and progressed to a later Pipeline stage in the Current FQ, it will still remain associated with the Previous FQ for Generated Pipeline reporting.
When should I use “Consider Only First Movement = False”?
This option is useful when you want RevSure to account for subsequent funnel movements instead of considering only the first time a record reached a stage.
For example:
Stage A → Stage B → Stage A
Setting Consider Only First Movement = False allows RevSure to consider the more recent applicable movement.